Oak Street Woodshop

A walnut side table

November 2026

Finished the breadboard ends this week. Drawbore pegs held up fine; the top got three coats of oil and a light wax.

Sharpening routine

October 2026

Back to a 1000 and 6000 water stone pair for the chisels. A leather strop with green compound keeps the edge between sessions.

Drying lumber

September 2026

Stickered the cherry boards in the garage with a box fan on low. Moisture meter reads about twelve percent after a month.